We hand you land that’s screened against the grid and locked down with assignable control and clean title. You carry it from there.
Sample deliverables: the landowner one‑pager, the owner questionnaire, and a full project overview. Click to shuffle.
Grid capacity and local policy move. We re-check every site against each data refresh, so a pipeline from Verde stays live, not a list that went stale the week it was built.
However you build, we meet your pipeline where it is.
We hand over fully de-risked, financeable sites with assignable control. You carry them from notice-to-proceed to operation.
We stay in through development and operations, sharing the lift and the risk on sites we originate together.
A standing origination program sized to your targets: geographies, interconnection profile, and MW cadence you set.
We carry the land risk first. By the time a parcel reaches your pipeline, the interconnection, the title, and the landowner are already real. The funnel narrows for a reason: most ground never clears the grid.