We find the land the grid is ready for.

We start with hosting capacity, not a map. The parcels the grid can take, carried from raw ground to an operating project.

One company, two ways in

Whichever side you’re on, it’s the same team.

Community-scale ground-mount solar
Community solar5 MW sites on the feeders utilities can actually take
Distributed battery storage site
Battery storageStandalone or solar‑paired, where the grid needs it
Agrivoltaic dual-use farmland
Dual-use landFarmland that keeps working under the array
By the numbers
30+
Projects directly originated
100+
Built + operating, team-wide
350+ MW
Capacity across the portfolio
6
States with operating projects
Why grid-first wins

The land is easy. The grid is the constraint.

We run this filter across the whole grid, feeder by feeder. Precision at volume is what turns raw grid data into sites that actually connect, and it’s why our origination shows up as operating megawatts, not a pipeline of maybes.

Precision at volume
How we work

From hosting capacity to an operating project.

Grid‑first, every time. We find where the grid is ready before we ever talk to a landowner, then carry the site the whole way.

Screen the grid

Every feeder gets a hosting-capacity check first; we pursue only the ground the grid can actually take.

Secure the site

We go to the few qualifying landowners directly and lock down site control with a lease and clean title.

De‑risk + permit

Interconnection study, zoning and local permitting carried to an approved, signing‑ready site.

Build + operate

Taken through construction to an energized project, or handed to the developer who builds it.

What you get

A site that’s ready, and a deal that holds.

For landowners

Income on land you keep

  • A long‑term lease with steady, escalating rent
  • No cost to you to develop the project
  • Your land kept, farmed around where it fits, and returned
  • Decommissioning secured up front
For developers

A ready‑to‑build site

  • Interconnection screened and studied on a feeder with real capacity
  • Site control secured, with clean title
  • Zoning and local permitting cleared
  • A defined buildable area and site plan